The database describes 17,523 sites with a capacity of 62,247MW.
In the year to the end of March-2026, there were 8,385 of these sites with
a capacity of 57,289MW generating approximately 143,123GWh and receiving 108,351,771 ROCs.
Data last updated : May-2026. Page 1 of 176 in ascending order of Subsidy.
|
ID |
Generator Name |
Country |
IC (kW) |
Technology |
Subsidy |
Accreditation |
Commissioned |
RLF |
ALF |
Latest |
Latest MWh p.a. |
|---|
| ACH |
Achlachan Wind Farm |
SC |
10,000 |
On-shore wind |
CfD |
2020-01-15 |
2019-04-08 |
31.8% |
33.3% |
2026‑03 |
29,183 |
| ADS |
Adstock |
EN |
23,523 |
Photovoltaic |
CfD |
2024-02-22 |
2025-07-01 |
13.6% |
16.4% |
2026‑03 |
25,305 |
| ALS |
Aller Langport |
EN |
14,168 |
Photovoltaic |
CfD |
2024-02-20 |
2025-08-05 |
12.4% |
14.0% |
2026‑03 |
15,124 |
| ASF |
Alfreton |
EN |
19,895 |
Photovoltaic |
CfD |
2024-08-21 |
2025-01-22 |
15.0% |
14.9% |
2026‑03 |
19,902 |
| BAD |
Bad a Cheo Wind Farm |
SC |
27,000 |
On-shore wind |
CfD |
2019-07-05 |
2019-03-31 |
27.2% |
33.2% |
2026‑03 |
77,611 |
| BEA |
Beatrice Offshore |
SC |
588,000 |
Off-shore wind |
CfD |
2018-07-18 |
2019-04-28 |
38.0% |
40.6% |
2026‑04 |
2,093,880 |
| RWS |
Rampisham Woods |
EN |
11,088 |
Photovoltaic |
CfD |
2025-06-23 |
2025-12-14 |
|
|
2026‑03 |
7,201 |
| BKM |
Kype Muir Wind Farm |
SC |
88,400 |
On-shore wind |
CfD |
2018-10-12 |
2019-03-28 |
25.4% |
29.4% |
2026‑04 |
227,879 |
| BMH |
Moor House Wind Farm |
EN |
12,300 |
On-shore wind |
CfD |
2017-12-22 |
2018-04-03 |
31.4% |
33.7% |
2026‑03 |
36,304 |
| BMM |
Middle Muir Wind Farm |
SC |
51,000 |
On-shore wind |
CfD |
2018-09-05 |
2019-01-09 |
22.4% |
27.4% |
2026‑04 |
122,191 |
| BRE |
Brenig Wind Farm |
WA |
37,600 |
On-shore wind |
CfD |
2019-10-18 |
2019-03-29 |
31.9% |
32.7% |
2026‑03 |
107,576 |
| BRN |
Braintree |
EN |
26,000 |
Photovoltaic |
CfD |
|
2025-12-17 |
|
|
2026‑03 |
5,325 |
| BSL |
Basildon |
EN |
23,295 |
Photovoltaic |
CfD |
2024-06-21 |
2025-07-01 |
13.9% |
15.9% |
2026‑03 |
24,477 |
| BSP |
Bishampton |
EN |
31,547 |
Photovoltaic |
CfD |
2023-12-12 |
2025-01-20 |
10.7% |
10.8% |
2026‑03 |
28,347 |
| BUR |
Burbo Bank Extension |
EN |
259,000 |
Off-shore wind |
CfD |
2016-11-12 |
2017-04-11 |
38.7% |
39.1% |
2026‑03 |
884,524 |
| LYN |
Lynemouth Power Station |
EN |
420,000 |
Dedicated biomass |
CfD |
2019-04-01 |
2018-06-23 |
52.7% |
69.1% |
2026‑03 |
2,542,340 |
| LYR |
Layer |
EN |
62,682 |
Photovoltaic |
CfD |
2024-10-14 |
2025-07-15 |
14.0% |
14.0% |
2026‑03 |
64,904 |
| CAM |
Triangle Farm Solar Park |
EN |
11,999 |
Photovoltaic |
CfD |
2023-01-13 |
2017-07-18 |
13.5% |
12.7% |
2026‑04 |
12,298 |
| CLH |
Cleve Hill |
EN |
372,827 |
Photovoltaic |
CfD |
2025-05-16 |
2025-11-05 |
9.6% |
9.6% |
2026‑03 |
257,194 |
| CLO |
Clocaenog Forest Wind Farm |
WA |
96,000 |
On-shore wind |
CfD |
2020-11-05 |
2019-10-31 |
27.3% |
29.0% |
2026‑03 |
243,547 |
| CNS |
Carn Nicholas |
EN |
9,914 |
Photovoltaic |
CfD |
2023-03-31 |
2025-04-17 |
12.2% |
13.9% |
2026‑04 |
9,955 |
| COI |
Coire Na Cloiche Windfarm |
SC |
30,520 |
On-shore wind |
CfD |
2020-02-02 |
2019-06-25 |
25.5% |
24.9% |
2026‑03 |
65,512 |
| COM |
Common Barn Wind Farm |
EN |
6,150 |
On-shore wind |
CfD |
2019-03-19 |
2019-06-18 |
29.7% |
32.2% |
2026‑03 |
17,329 |
| DOR |
Dorenell Wind Farm |
SC |
177,000 |
On-shore wind |
CfD |
2019-07-16 |
2018-12-20 |
22.2% |
20.1% |
2026‑03 |
312,444 |
| DRF |
Driffield |
EN |
48,661 |
Photovoltaic |
CfD |
2025-07-02 |
2026-01-08 |
|
|
2026‑03 |
11,988 |
| DRX |
Drax CfD Unit 1 |
EN |
645,000 |
Dedicated biomass |
CfD |
|
2016-12-21 |
66.9% |
86.7% |
2026‑03 |
4,895,650 |
| DUD |
Dudgeon Offshore |
EN |
402,000 |
Off-shore wind |
CfD |
2017-09-19 |
2017-10-01 |
45.1% |
48.3% |
2026‑03 |
1,700,920 |
| EAS |
East Anglia 1 Offshore |
EN |
714,000 |
Off-shore wind |
CfD |
2019-09-02 |
2020-05-30 |
43.1% |
48.9% |
2026‑03 |
3,057,020 |
| MOE |
Moray East |
SC |
950,000 |
Off-shore wind |
CfD |
2021-06-22 |
2024-03-04 |
23.7% |
19.2% |
2026‑03 |
1,601,060 |
| SCL |
St Cleres |
EN |
23,132 |
Photovoltaic |
CfD |
2024-02-19 |
2025-07-01 |
12.8% |
15.3% |
2026‑03 |
23,602 |
| SID |
Siddington |
EN |
20,881 |
Photovoltaic |
CfD |
2024-10-28 |
2025-08-14 |
11.6% |
11.9% |
2026‑03 |
20,203 |
| MYN |
Mynydd Y Gwair Wind Farm |
WA |
33,600 |
On-shore wind |
CfD |
2019-07-05 |
2019-03-20 |
34.3% |
33.7% |
2026‑03 |
99,130 |
| YSF |
Yelvertoft |
EN |
48,390 |
Photovoltaic |
CfD |
2024-11-13 |
2025-10-28 |
12.2% |
12.4% |
2026‑03 |
49,995 |
| HR2 |
Hornsea 2 |
EN |
1,320,000 |
Off-shore wind |
CfD |
2022-01-19 |
2024-03-28 |
43.7% |
47.3% |
2026‑03 |
5,472,220 |
| LIG |
Charity Farm Solar |
EN |
14,402 |
Photovoltaic |
CfD |
2016-06-23 |
2016-06-30 |
13.0% |
14.1% |
2026‑03 |
14,763 |
| HOR |
Hornsea 1 |
EN |
1,200,000 |
Off-shore wind |
CfD |
2019-02-26 |
2021-03-31 |
44.9% |
50.4% |
2026‑03 |
5,293,880 |
| NAN |
Nanclach Wind Farm |
SC |
39,100 |
On-shore wind |
CfD |
2021-09-06 |
2019-10-01 |
34.0% |
32.4% |
2026‑03 |
110,818 |
| NEA |
Neart na Gaoithe |
SC |
453,600 |
Off-shore wind |
CfD |
2024-10-29 |
2025-04-16 |
39.3% |
46.0% |
2026‑03 |
1,804,600 |
| LFS |
Low Farm |
EN |
49,987 |
Photovoltaic |
CfD |
2024-09-12 |
2025-06-16 |
6.5% |
6.7% |
2026‑03 |
26,161 |
| K3C |
Kemsley K3 CHP |
EN |
45,000 |
Waste |
CfD |
2021-03-16 |
2020-07-17 |
31.7% |
23.5% |
2026‑03 |
92,527 |
| SOL |
Solway Wind Farm |
SC |
30,000 |
On-shore wind |
CfD |
2021-09-21 |
2020-11-27 |
27.6% |
36.7% |
2026‑03 |
96,330 |
| MFS |
Bicker Fen |
EN |
22,559 |
Photovoltaic |
CfD |
2024-03-29 |
2025-05-07 |
10.1% |
8.6% |
2026‑04 |
15,039 |
| NEL |
Whitecross |
EN |
35,217 |
Photovoltaic |
CfD |
2023-07-21 |
2025-03-31 |
14.2% |
18.4% |
2026‑03 |
37,077 |
| SNE |
Sneddon Law |
SC |
30,000 |
On-shore wind |
CfD |
2023-10-09 |
2024-04-04 |
28.8% |
32.3% |
2026‑04 |
84,783 |
| SSF |
Stokeford |
EN |
28,515 |
Photovoltaic |
CfD |
2024-11-14 |
2025-05-07 |
16.5% |
16.0% |
2026‑04 |
31,059 |
| STV |
Staveley |
EN |
28,927 |
Photovoltaic |
CfD |
2024-05-02 |
2025-07-09 |
11.7% |
13.0% |
2026‑03 |
27,834 |
| WAL |
Walney Extension |
EN |
660,000 |
Off-shore wind |
CfD |
2017-09-02 |
2018-04-13 |
43.5% |
46.0% |
2026‑03 |
2,662,590 |
| LSF |
Litchardon |
EN |
60,247 |
Photovoltaic |
CfD |
2023-08-08 |
2025-01-06 |
10.7% |
10.3% |
2026‑03 |
45,174 |
| TLG |
Tralorg Wind Farm |
SC |
19,000 |
On-shore wind |
CfD |
2020-10-14 |
2020-11-13 |
30.4% |
32.7% |
2026‑03 |
53,914 |
| TEE |
Teesside Biomass |
EN |
299,000 |
Dedicated biomass |
CfD |
2022-08-09 |
2023-09-30 |
33.3% |
53.8% |
2026‑04 |
1,408,420 |
| IGS |
Inkersall Grange |
EN |
70,007 |
Photovoltaic |
CfD |
2025-05-23 |
2026-01-05 |
|
|
2026‑03 |
50,470 |
| TKN |
Triton Knoll |
EN |
860,000 |
Off-shore wind |
CfD |
2021-03-05 |
2023-03-31 |
35.5% |
40.3% |
2026‑03 |
3,036,060 |
| G01374NWWA |
Ty Nant |
WA |
80 |
On-shore wind |
FiT |
2011-11-08 |
2011-11-04 |
20.0% |
23.5% |
2026‑03 |
165 |
| G01387HYEN |
Heron Corn Mill |
EN |
100 |
Hydro |
FiT |
2010-09-30 |
2010-08-06 |
9.5% |
44.0% |
2026‑04 |
385 |
| G01392BWEN |
Sandhill Biogas Plant |
EN |
3,326 |
Anaerobic Digestion |
FiT |
2011-01-11 |
2011-01-11 |
81.9% |
96.0% |
2026‑04 |
27,961 |
| G01408NWWA |
Tryal Bach |
WA |
160 |
On-shore wind |
FiT |
2012-11-28 |
2012-11-28 |
26.3% |
28.0% |
2026‑03 |
392 |
| G01087BWSC |
Lochhead AD Plant |
SC |
1,160 |
Anaerobic Digestion |
FiT |
2013-11-27 |
2013-11-27 |
46.1% |
38.7% |
2026‑02 |
3,929 |
| G01383HYEN |
Logan Gill Hydro Station |
EN |
495 |
Hydro |
FiT |
2010-06-25 |
2010-06-12 |
30.7% |
38.5% |
2026‑03 |
1,516 |
| G00003HPSC |
Blackwater |
SC |
790 |
Hydro |
FiT |
2021-11-25 |
2021-11-25 |
61.6% |
68.1% |
2026‑03 |
4,711 |
| G01400HYEN |
Linton Falls |
EN |
100 |
Hydro |
FiT |
2011-09-08 |
2011-08-30 |
38.5% |
32.5% |
2026‑03 |
285 |
| G00004HPSC |
Allt na Moine Hydro Scheme |
SC |
2,000 |
Hydro |
FiT |
2023-01-18 |
2023-01-18 |
23.8% |
44.3% |
2026‑03 |
7,766 |
| G01384NWWA |
Gwelfor |
WA |
80 |
On-shore wind |
FiT |
2012-04-13 |
2012-04-13 |
30.6% |
33.3% |
2026‑03 |
233 |
| G01389NWWA |
Crud Y Gwynt |
WA |
80 |
On-shore wind |
FiT |
2012-06-29 |
2012-06-29 |
23.5% |
27.4% |
2026‑04 |
192 |
| G01392NWWA |
Scollock West |
WA |
80 |
On-shore wind |
FiT |
2012-08-11 |
2012-08-11 |
15.7% |
14.4% |
2026‑03 |
101 |
| G01408HYWA |
Caseg Hydro |
WA |
500 |
Hydro |
FiT |
2013-04-16 |
2013-04-10 |
37.5% |
38.2% |
2026‑03 |
1,675 |
| G01407NWWA |
Infinite Ventures (Crican) Limited |
WA |
500 |
On-shore wind |
FiT |
2012-11-28 |
2012-11-23 |
37.3% |
42.4% |
2026‑04 |
1,857 |
| G01402NWWA |
Dolidre |
WA |
80 |
On-shore wind |
FiT |
2012-10-25 |
2012-10-23 |
14.2% |
15.1% |
2026‑03 |
106 |
| G01409HYEN |
Bealey's Weir |
EN |
100 |
Hydro |
FiT |
2012-05-11 |
2012-05-11 |
50.7% |
45.4% |
2026‑03 |
398 |
| G01385NWWA |
KC1 |
WA |
80 |
On-shore wind |
FiT |
2012-06-01 |
2012-06-01 |
29.8% |
25.8% |
2026‑03 |
181 |
| G01395NWWA |
Cerrigoerion1 |
WA |
160 |
On-shore wind |
FiT |
2012-08-28 |
2012-08-28 |
11.9% |
16.0% |
2026‑03 |
224 |
| G01410NWWA |
Caerllugest Farm |
WA |
80 |
On-shore wind |
FiT |
2012-11-28 |
2012-11-28 |
15.1% |
16.1% |
2026‑03 |
113 |
| G01410HYWA |
PLAS TAN Y BWLCH |
WA |
30 |
Hydro |
FiT |
2013-05-02 |
2013-05-02 |
27.6% |
22.1% |
2026‑01 |
58 |
| G01415HYWA |
Tyllwyd Farm-RPL Hydro Ltd |
WA |
99 |
Hydro |
FiT |
2013-11-14 |
2013-11-13 |
31.2% |
54.7% |
2026‑02 |
474 |
| G01414HYWA |
Cadair Hydro (without grid restriction) |
WA |
380 |
Hydro |
FiT |
2013-11-03 |
2013-11-03 |
43.6% |
53.5% |
2026‑03 |
1,781 |
| G01412HYWA |
Coed Dias |
WA |
15 |
Hydro |
FiT |
2013-09-12 |
2013-09-10 |
38.6% |
38.8% |
2026‑03 |
51 |
| G01417BWEN |
Doncaster AD plant |
EN |
4,964 |
Anaerobic Digestion |
FiT |
2011-11-08 |
2011-11-08 |
62.9% |
68.9% |
2026‑02 |
29,973 |
| G01417HYWA |
Tyllwyd Farm -REL Hydro Ltd |
WA |
99 |
Hydro |
FiT |
2013-10-17 |
2013-09-24 |
16.7% |
24.4% |
2026‑01 |
212 |
| G01416HYEN |
Mill House Padworth Hydro |
EN |
42 |
Hydro |
FiT |
2012-05-28 |
2012-05-28 |
63.8% |
56.8% |
2026‑03 |
209 |
| G01412HYEN |
Arrow Mills |
EN |
15 |
Hydro |
FiT |
2012-02-23 |
2012-02-23 |
28.2% |
28.9% |
2026‑03 |
38 |
| G01388HYEN |
De Lank |
EN |
92 |
Hydro |
FiT |
2011-09-21 |
2011-09-21 |
23.4% |
29.0% |
2026‑03 |
234 |
| G01382NWWA |
Derwin 1 |
WA |
160 |
On-shore wind |
FiT |
2012-03-13 |
2012-03-12 |
20.2% |
21.3% |
2026‑04 |
298 |
| G01383HYWA |
Pandy Mill House |
WA |
100 |
Hydro |
FiT |
2012-06-01 |
2012-06-01 |
41.6% |
20.4% |
2026‑04 |
179 |
| G00698BWWA |
Glanmeheli AD |
WA |
499 |
Anaerobic Digestion |
FiT |
2015-09-25 |
2015-09-25 |
86.0% |
71.0% |
2026‑03 |
3,103 |
| G01384HYEN |
Roach Bridge Mill |
EN |
200 |
Hydro |
FiT |
2011-05-24 |
2011-05-24 |
20.9% |
14.6% |
2026‑04 |
256 |
| G01385HYEN |
Greenholme Mill |
EN |
350 |
Hydro |
FiT |
2011-05-09 |
2011-05-09 |
34.1% |
30.9% |
2026‑03 |
946 |
| G00712BWWA |
Grays Biogas |
WA |
2,000 |
Anaerobic Digestion |
FiT |
2016-06-23 |
2016-06-23 |
49.4% |
88.0% |
2026‑02 |
15,426 |
| G00714BWWA |
Pencefn AD |
WA |
200 |
Anaerobic Digestion |
FiT |
2016-07-26 |
2016-07-26 |
69.0% |
78.9% |
2026‑04 |
1,382 |
| G01398NWWA |
Tanrhos1 |
WA |
80 |
On-shore wind |
FiT |
2012-09-25 |
2012-09-25 |
20.4% |
13.8% |
2026‑03 |
97 |
| G01386NWWA |
Maes Gwyn Uchaf |
WA |
80 |
On-shore wind |
FiT |
2012-06-08 |
2012-06-08 |
18.8% |
18.0% |
2026‑03 |
126 |
| G00740BWWA |
Maesydd |
WA |
210 |
Anaerobic Digestion |
FiT |
2018-03-16 |
2018-03-16 |
84.5% |
77.1% |
2026‑03 |
1,419 |
| G01388NWWA |
Fron Bella |
WA |
80 |
On-shore wind |
FiT |
2012-06-25 |
2012-06-25 |
24.7% |
29.0% |
2026‑03 |
203 |
| G01391HYEN |
Selset Hydro Electric Power Station |
EN |
750 |
Hydro |
FiT |
2011-01-19 |
2011-01-19 |
64.3% |
46.6% |
2026‑02 |
3,060 |
| G01390NWWA |
TEGRYNWIND |
WA |
80 |
On-shore wind |
FiT |
2012-07-09 |
2012-06-21 |
26.2% |
24.7% |
2026‑03 |
173 |
| G00817HYEN |
Sonning Mill |
EN |
25 |
Hydro |
FiT |
2005-07-01 |
2005-07-01 |
34.6% |
21.0% |
2026‑03 |
46 |
| G01094BWSC |
Keithick Biogas |
SC |
249 |
Anaerobic Digestion |
FiT |
2014-12-11 |
2014-12-11 |
32.3% |
84.9% |
2026‑03 |
1,851 |
| G01397HYWA |
Strata Florida Hydro |
WA |
140 |
Hydro |
FiT |
2012-07-06 |
2012-06-27 |
76.6% |
58.5% |
2026‑01 |
717 |
| G01403NWWA |
G.D. & G.D. Roberts |
WA |
80 |
On-shore wind |
FiT |
2012-11-23 |
2012-11-23 |
20.1% |
22.3% |
2026‑04 |
156 |
| G01403BWEN |
Clayton Hall Farm Bioenergy |
EN |
1,000 |
Anaerobic Digestion |
FiT |
2011-03-25 |
2011-03-02 |
57.3% |
67.2% |
2026‑04 |
5,882 |
| G01401NWWA |
tremoilet wind turbine |
WA |
80 |
On-shore wind |
FiT |
2012-10-19 |
2012-10-07 |
24.4% |
27.7% |
2026‑04 |
194 |
| G01406NWWA |
Clynmaenllwyd |
WA |
80 |
On-shore wind |
FiT |
2012-11-28 |
2012-11-28 |
16.8% |
14.8% |
2026‑01 |
104 |