IDRO ID or Rego ID uniquely identifying generator | Generator Name | CountryThe Renewables Obligation is administered in three areas, Northern Ireland, Scotland, and England/Wales. This field shows the country where the generator is located. | IC (kW)The total installed generating capacity of each generator in kilowatts (kW), as recorded by Ofgem. REF has corrected obvious errors. | TechnologyRenewable technology type | SubsidySubsidy mechanism RO,FiT,None | AccreditationThe date at which the generator was accorded accredited status with Ofgem; this is usually the date of first generation. | CommissionedDate when generator first commissioned | RLFThe rolling load factor is the average of all available rolling 12 month periods in the currently available data for the site. | ALFThe most recent annual load factor to year ending at Latest ROC Date | LatestDataLatest date for ROCs received | Latest MWh p.a.MWh generated in the latest year for which data is available | Latest ROCs p.a.ROCs earned in the latest year for which data is available |
C00083RAEN | Drax Biomass Conversion | England | 1,935,000 | Dedicated biomass | RO | 2003-03-01 | 1974-01-01 | 68.5% | 58.4% | 2023-09 | 9,893,120 | 9,893,120 |
T_HOWBO | Hornsea 2 - Phase 2 | England | 1,386,000 | Off-shore wind | None | 2022-01-19 | 2021-08-28 | 39.4% | 39.9% | 2023-11 | 4,843,180 | |
HOR | Hornsea 1 | England | 1,200,000 | Off-shore wind | CfD | 2019-02-26 | 2019-05-02 | 46.4% | 45.2% | 2023-11 | 4,753,670 | |
EAS | East Anglia 1 Offshore | England | 714,000 | Off-shore wind | CfD | 2019-09-02 | 2019-10-30 | 44.0% | 46.8% | 2023-11 | 2,925,790 | |
WAL | Walney Extension | England | 660,000 | Off-shore wind | CfD | 2017-09-02 | 2017-12-19 | 43.8% | 42.1% | 2023-11 | 2,433,440 | |
R00021RPEN | London Array Offshore Windfarm | England | 630,000 | Off-shore wind | RO | 2012-11-04 | 2012-11-04 | 40.3% | 42.1% | 2023-10 | 2,325,610 | 4,235,720 |
TKN | Triton Knoll | England | 857,250 | Off-shore wind | CfD | 2021-03-05 | 2021-05-17 | 33.3% | 37.0% | 2023-11 | 2,258,260 | |
R00032RPEN | Race Bank | England | 573,300 | Off-shore wind | RO | 2017-06-08 | 2017-06-08 | 43.1% | 42.5% | 2023-11 | 2,135,910 | 3,084,680 |
BEA | Beatrice Offshore | Scotland | 588,000 | Off-shore wind | CfD | 2018-07-18 | 2018-11-06 | 38.3% | 37.4% | 2023-11 | 1,925,260 | |
T_MOWEO | Moray East Offshore | Scotland | 950,000 | Off-shore wind | None | 2021-06-22 | 2021-06-02 | 29.1% | 22.8% | 2023-11 | 1,896,080 | |
R00007RPWA | Gwynt y Mor | Wales | 576,000 | Off-shore wind | RO | 2013-09-30 | 2013-09-30 | 31.5% | 33.5% | 2023-10 | 1,688,390 | 3,048,830 |
R00014RPEN | Greater Gabbard | England | 504,000 | Off-shore wind | RO | 2011-02-23 | 2011-02-23 | 38.3% | 37.6% | 2023-11 | 1,661,400 | 2,558,490 |
DUD | Dudgeon Offshore | England | 394,910 | Off-shore wind | CfD | 2017-09-19 | 2017-04-27 | 46.3% | 44.5% | 2023-11 | 1,541,240 | |
R00034RPEN | Rampion | England | 400,200 | Off-shore wind | RO | 2017-11-26 | 2017-11-26 | 37.6% | 43.5% | 2023-10 | 1,524,960 | 2,496,230 |
R00027RPEN | West of Duddon Sands Offshore Wind Farm | England | 388,800 | Off-shore wind | RO | 2014-02-10 | 2014-02-10 | 43.7% | 43.2% | 2023-10 | 1,470,740 | 2,635,010 |
R00031RPEN | Galloper Wind Farm | England | 352,800 | Off-shore wind | RO | 2017-11-05 | 2017-11-05 | 46.7% | 47.2% | 2023-10 | 1,458,230 | 2,372,140 |
T_SGRWO | Seagreen Wind Energy Limited | Scotland | 1,140,000 | Off-shore wind | None | 2022-08-22 | 2022-08-22 | 13.3% | 14.1% | 2023-11 | 1,412,300 | |
R00025RPEN | Lincs Wind Farm | England | 270,000 | Off-shore wind | RO | 2012-08-27 | 2012-08-27 | 40.1% | 40.1% | 2023-11 | 949,170 | 1,542,240 |
R00015RPEN | Thanet Offshore Wind Farm | England | 300,000 | Off-shore wind | RO | 2010-07-02 | 2010-07-02 | 33.3% | 34.9% | 2023-10 | 916,400 | 1,675,140 |
R00022RPEN | Sheringham Shoal | England | 317,000 | Off-shore wind | RO | 2011-09-02 | 2011-09-02 | 37.4% | 31.3% | 2023-11 | 867,877 | 1,441,850 |
DRX | Drax CfD Unit 1 | England | 645,000 | Dedicated biomass | CfD | 2016-12-21 | 66.2% | 14.5% | 2023-11 | 820,195 | ||
BUR | Burbo Bank Extension | England | 259,000 | Off-shore wind | CfD | 2016-11-12 | 2017-04-11 | 38.7% | 36.2% | 2023-11 | 818,738 | |
R00028RPEN | Westermost Rough | England | 210,000 | Off-shore wind | RO | 2014-09-12 | 2014-09-12 | 46.1% | 42.8% | 2023-11 | 786,526 | 1,285,270 |
R00029RPEN | Humber Gateway Offshore Wind Farm | England | 219,000 | Off-shore wind | RO | 2015-03-02 | 2015-03-02 | 42.9% | 40.7% | 2023-10 | 781,176 | 1,429,240 |
R00023RPEN | Walney Offshore Wind Phase II | England | 183,600 | Off-shore wind | RO | 2011-08-25 | 2011-08-25 | 44.6% | 38.1% | 2023-11 | 612,612 | 1,081,150 |
R00210RQWA | Pen y Cymoedd Wind Farm | Wales | 228,000 | On-shore wind | RO | 2016-10-17 | 2016-10-17 | 30.9% | 29.2% | 2023-10 | 583,750 | 485,122 |
R00089SQSC | Whitelee Windfarm | Scotland | 322,000 | On-shore wind | RO | 2007-12-14 | 2007-12-14 | 21.1% | 20.7% | 2023-10 | 583,394 | 519,807 |
R00332SQSC | Stronelairg Wind Farm | Scotland | 227,700 | On-shore wind | RO | 2018-03-24 | 2018-03-24 | 30.4% | 28.7% | 2023-09 | 573,279 | 515,956 |
R00316SQSC | Kilgallioch | Scotland | 248,540 | On-shore wind | RO | 2016-12-15 | 2016-12-15 | 25.6% | 24.1% | 2023-10 | 524,756 | 427,820 |
R00019RPEN | Walney Offshore Wind Phase I | England | 183,600 | Off-shore wind | RO | 2011-02-07 | 2011-01-13 | 39.1% | 31.4% | 2023-11 | 504,792 | 882,540 |
G01962HYSC | Lochaber hydro station 1 | Scotland | 86,500 | Hydro | None | 2019-05-08 | 2011-11-14 | 68.2% | 64.4% | 2023-11 | 487,764 | |
R00187SQSC | Clyde Windfarm (North) | Scotland | 197,700 | On-shore wind | RO | 2012-08-01 | 2012-06-01 | 30.8% | 26.1% | 2023-10 | 452,419 | 387,429 |
R00173SQSC | Clyde Windfarm (Central) | Scotland | 195,900 | On-shore wind | RO | 2012-01-17 | 2011-10-06 | 27.8% | 24.9% | 2023-09 | 426,833 | 408,707 |
T_SOKYW | South Kyle | Scotland | 235,000 | On-shore wind | None | 2022-09-16 | 18.9% | 20.6% | 2023-11 | 423,494 | ||
LYN | Lynemouth Power Station | England | 406,790 | Dedicated biomass | CfD | 2019-04-01 | 2018-06-23 | 55.5% | 11.9% | 2023-11 | 422,595 | |
R00020RPEN | Ormonde Wind Farm | England | 150,000 | Off-shore wind | RO | 2011-08-18 | 2011-08-18 | 35.5% | 26.6% | 2023-10 | 350,064 | 613,650 |
R00008SASC | Markinch CHP | Scotland | 61,625 | Dedicated biomass | RO | 2014-02-06 | 2014-02-06 | 61.0% | 63.7% | 2023-09 | 343,780 | 687,559 |
R00161SQSC | Fallago Rig | Scotland | 144,000 | On-shore wind | RO | 2013-01-24 | 2013-01-24 | 29.0% | 27.1% | 2023-10 | 341,441 | 319,220 |
R00012RPEN | Gunfleet Sands I | England | 108,000 | Off-shore wind | RO | 2009-07-24 | 2009-07-24 | 34.4% | 36.0% | 2023-11 | 340,381 | 413,291 |
R00005SASC | Stevens Croft - A, B, C, D, E, (01/06/07) | Scotland | 50,725 | Dedicated biomass | RO | 2007-11-08 | 2007-11-08 | 67.8% | 75.5% | 2023-10 | 335,370 | 610,273 |
R00381RAEN | Snetterton Renewable Energy Plant | England | 49,458 | Dedicated biomass | RO | 2016-12-13 | 2016-12-13 | 65.2% | 76.4% | 2023-10 | 331,179 | 428,483 |
R00169SQSC | Whitelee Windfarm Extension | Scotland | 217,000 | On-shore wind | RO | 2011-12-09 | 2011-12-09 | 17.4% | 17.3% | 2023-10 | 329,009 | 289,370 |
R00254RAEN | Brigg REP | England | 54,635 | Dedicated biomass | RO | 2015-10-20 | 2015-10-20 | 65.1% | 78.8% | 2023-10 | 324,629 | 410,502 |
R00237RAEN | Iggesund Paperboard Biomass CHP | England | 50,000 | Dedicated biomass | RO | 2013-02-17 | 2013-02-17 | 73.8% | 73.6% | 2023-10 | 322,177 | 613,891 |
G00890MWEN | Ferrybridge FM2 | England | 79,280 | Waste | None | 2019-12-19 | 2019-12-19 | 39.2% | 44.4% | 2023-11 | 308,176 | |
R00002DTSC | Aberdeen Offshore Windfarm - Demonstration | Scotland | 96,800 | Off-shore wind | RO | 2018-07-02 | 2018-07-02 | 36.0% | 35.4% | 2023-08 | 300,469 | 751,172 |
R00103SQSC | Crystal Rig II Wind Farm | Scotland | 138,000 | On-shore wind | RO | 2009-12-16 | 2009-12-16 | 29.4% | 24.9% | 2023-11 | 300,418 | 248,124 |
R00011RPEN | Inner Dowsing Offshore Wind Farm | England | 97,200 | Off-shore wind | RO | 2008-04-20 | 2008-04-20 | 34.9% | 34.0% | 2023-11 | 289,499 | 346,089 |
R00002SPSC | Robin Rigg Offshore Wind Farm (West) | Scotland | 90,000 | Off-shore wind | RO | 2009-07-18 | 2009-07-18 | 35.6% | 36.0% | 2023-10 | 284,240 | 382,639 |
R00010RPEN | Lynn Offshore Wind Farm | England | 97,200 | Off-shore wind | RO | 2008-03-28 | 2008-03-15 | 34.5% | 33.1% | 2023-11 | 281,992 | 335,219 |
R00165SQSC | Clyde Windfarm (South) | Scotland | 128,800 | On-shore wind | RO | 2011-07-01 | 2011-07-01 | 26.7% | 24.6% | 2023-09 | 277,048 | 277,048 |
G00878MWEN | Ferrybridge FM1 | England | 81,000 | Waste | None | 2015-07-25 | 2015-07-25 | 34.4% | 38.3% | 2023-11 | 272,078 | |
R00005RPWA | Rhyl Flats Wind farm | Wales | 90,000 | Off-shore wind | RO | 2009-07-15 | 2009-07-15 | 34.6% | 33.5% | 2023-09 | 264,225 | 396,317 |
G00852MWEN | Riverside Resource Recovery Limited | England | 84,900 | Waste | None | 2020-08-07 | 2020-08-07 | 38.2% | 35.1% | 2023-11 | 261,046 | |
R00202RAEN | Sleaford REP | England | 45,000 | Dedicated biomass | RO | 2014-08-01 | 2014-08-01 | 67.1% | 66.1% | 2023-10 | 260,402 | 467,056 |
R00007RAEN | Thetford Power Station (RA) - A B | England | 44,200 | Dedicated biomass | RO | 2002-04-01 | 1998-10-01 | 68.2% | 66.0% | 2023-10 | 255,391 | 342,503 |
R00003SPSC | Robin Rigg Offshore Wind Farm (East) | Scotland | 90,000 | Off-shore wind | RO | 2010-04-20 | 2010-04-20 | 32.5% | 32.1% | 2023-10 | 253,048 | 451,568 |
DOR | Dorenell Wind Farm | Scotland | 173,700 | On-shore wind | CfD | 2019-07-16 | 2018-12-20 | 24.6% | 16.6% | 2023-11 | 252,156 | |
R00344RAEN | Tilbury Green Power | England | 44,491 | Dedicated biomass | RO | 2017-10-26 | 2017-10-26 | 59.2% | 64.4% | 2023-07 | 251,083 | 351,509 |
R00312SQSC | Dunmaglass Wind Farm | Scotland | 94,050 | On-shore wind | RO | 2016-09-13 | 2016-09-13 | 32.0% | 30.4% | 2023-09 | 250,524 | 225,474 |
R00160SQSC | Griffin & Calliachar Wind Farm | Scotland | 188,600 | On-shore wind | RO | 2011-07-05 | 2011-07-05 | 18.6% | 15.0% | 2023-09 | 248,534 | 248,534 |
R00006RPEN | Kentish Flats Ltd - A,C | England | 90,000 | Off-shore wind | RO | 2005-08-01 | 2005-08-01 | 30.7% | 30.8% | 2023-10 | 242,902 | 224,047 |
R00007RPEN | Barrow Offshore Windfarm - A | England | 90,000 | Off-shore wind | RO | 2006-01-01 | 2006-01-01 | 34.9% | 29.5% | 2023-11 | 232,489 | 183,252 |
CLO | Clocaenog Forest Wind Farm | Wales | 95,680 | On-shore wind | CfD | 2020-11-05 | 2019-10-31 | 26.8% | 27.0% | 2023-11 | 226,274 | |
R00224SQSC | Harestanes Windfarm | Scotland | 140,760 | On-shore wind | RO | 2013-09-20 | 2013-09-20 | 17.4% | 18.0% | 2023-10 | 222,279 | 196,494 |
R00062RAWA | Margam REP [2] | Wales | 46,600 | Dedicated biomass | RO | 2018-09-10 | 2018-09-10 | 55.3% | 53.0% | 2023-10 | 216,299 | 271,077 |
R00147RAEN | Blackburn Meadows Renewable Energy Plant | England | 34,000 | Dedicated biomass | RO | 2014-06-24 | 2014-06-24 | 67.1% | 71.4% | 2023-09 | 212,619 | 340,560 |
R00011RAEN | Elean Business Park | England | 43,353 | Dedicated biomass | RO | 2002-04-01 | 2000-09-01 | 64.0% | 54.8% | 2023-10 | 208,088 | 285,235 |
R00262SQSC | Beinneun Wind Farm | Scotland | 110,080 | On-shore wind | RO | 2017-02-09 | 2017-02-09 | 23.0% | 21.5% | 2023-10 | 206,961 | 141,978 |
R00008RPEN | Burbo Offshore Windfarm - A (31/01/07) | England | 90,000 | Off-shore wind | RO | 2007-07-01 | 2007-07-01 | 33.2% | 26.2% | 2023-10 | 206,547 | 307,055 |
G00895MWEN | Allerton Waste Recovery Park | England | 31,990 | Waste | None | 2022-05-24 | 2017-10-05 | 73.8% | 72.8% | 2023-10 | 204,000 | |
R00013RPEN | Gunfleet Sands II | England | 64,800 | Off-shore wind | RO | 2009-07-24 | 2009-07-24 | 36.2% | 35.6% | 2023-11 | 202,220 | 245,384 |
R00357RAEN | Templeborough Biomass Power Plant | England | 48,960 | Dedicated biomass | RO | 2018-07-10 | 2018-07-10 | 58.0% | 46.4% | 2023-10 | 199,192 | 247,224 |
G01993BWEN | Rookery South | England | 72,860 | Unknown Biomass | None | 2022-02-28 | 2021-12-17 | 28.2% | 30.7% | 2023-11 | 196,210 | |
R00063SQSC | Hadyard Hill Windfarm - A,C | Scotland | 119,600 | On-shore wind | RO | 2005-11-01 | 2005-11-01 | 21.6% | 18.5% | 2023-09 | 194,117 | 194,117 |
R00024RPEN | Teesside windfarm | England | 62,100 | Off-shore wind | RO | 2013-07-05 | 2013-07-05 | 34.7% | 33.9% | 2023-10 | 184,148 | 333,383 |
G00482HYSC | Clunie Power Station | Scotland | 61,200 | Hydro | None | 2008-03-29 | 2008-03-29 | 36.5% | 34.2% | 2023-09 | 183,217 | |
G00474HYSC | Rannoch Power Station | Scotland | 44,100 | Hydro | None | 2008-03-29 | 2008-03-29 | 51.0% | 46.7% | 2023-09 | 180,561 | |
R00060SQSC | Black Law Windfarm - A,C | Scotland | 124,200 | On-shore wind | RO | 2005-03-01 | 2005-03-01 | 19.0% | 16.6% | 2023-10 | 180,390 | 159,421 |
R00030RPEN | Kentish Flats Extension Wind Farm | England | 49,500 | Off-shore wind | RO | 2015-09-01 | 2015-09-01 | 41.3% | 41.4% | 2023-10 | 179,630 | 314,286 |
R00251SQSC | Aikengall II Windfarm | Scotland | 60,800 | On-shore wind | RO | 2017-10-25 | 2017-10-25 | 40.4% | 32.8% | 2023-11 | 174,566 | 125,729 |
R00579RAEN | Cramlington Biomass CHP | England | 33,190 | Dedicated biomass | RO | 2017-09-12 | 2017-09-12 | 61.7% | 59.4% | 2023-09 | 172,560 | 216,005 |
G00891MWEN | Runcorn 2 ERF | England | 53,000 | Waste | None | 2019-11-14 | 2015-07-09 | 40.9% | 36.9% | 2023-11 | 171,468 | |
R00001SFSC | Glendoe Hydro Power Station | Scotland | 101,150 | Hydro | RO | 2008-11-18 | 2008-11-18 | 15.8% | 19.2% | 2023-09 | 170,262 | 170,262 |
R00093SQSC | Kilbraur Wind Farm | Scotland | 67,500 | On-shore wind | RO | 2008-06-14 | 2008-06-14 | 27.6% | 27.6% | 2023-11 | 163,271 | 128,554 |
G00476HYSC | Lochay Power Station | Scotland | 45,000 | Hydro | None | 2008-03-29 | 2008-03-29 | 42.2% | 41.3% | 2023-09 | 162,964 | |
R00005RPEN | Scroby Sands Wind Farm | England | 60,000 | Off-shore wind | RO | 2004-05-01 | 2004-05-01 | 31.3% | 30.6% | 2023-10 | 161,083 | 149,354 |
R00004RPWA | North Hoyle Offshore Wind Farm - A | Wales | 60,000 | Off-shore wind | RO | 2003-11-01 | 2003-10-28 | 33.5% | 30.4% | 2023-10 | 159,579 | 144,231 |
G00479HYSC | Fasnakyle power Station | Scotland | 69,000 | Hydro | None | 2008-03-29 | 2008-03-29 | 34.6% | 26.4% | 2023-09 | 159,429 | |
BKM | Kype Muir Wind Farm | Scotland | 88,400 | On-shore wind | CfD | 2018-10-12 | 2019-03-28 | 26.2% | 20.8% | 2023-11 | 158,914 | |
T_AKGLW | Aikengall IIA | Scotland | 82,000 | On-shore wind | None | 2021-12-17 | 2021-08-07 | 25.1% | 22.1% | 2023-11 | 157,955 | |
R00218RQWA | Brechfa Forest West Wind Farm | Wales | 57,400 | On-shore wind | RO | 2018-01-18 | 2018-01-18 | 33.3% | 31.4% | 2023-10 | 157,641 | 129,106 |
R00170SQSC | Gordonbush Wind Farm | Scotland | 71,750 | On-shore wind | RO | 2011-12-13 | 2011-11-14 | 27.3% | 24.9% | 2023-09 | 156,657 | 156,657 |
R00308SQSC | Dersalloch | Scotland | 73,600 | On-shore wind | RO | 2016-08-18 | 2016-08-18 | 23.0% | 24.0% | 2023-10 | 154,879 | 124,975 |
R00062SQSC | Farr Wind farm ltd - A | Scotland | 92,000 | On-shore wind | RO | 2005-10-01 | 2005-10-01 | 26.2% | 19.2% | 2023-11 | 154,755 | 128,549 |
G00781MWSC | Dunbar ERF | Scotland | 40,025 | Waste | None | 2018-11-07 | 2018-11-07 | 32.5% | 43.9% | 2023-11 | 153,948 | |
R00321SQSC | Bhlaraidh Wind Farm | Scotland | 110,400 | On-shore wind | RO | 2017-03-02 | 2017-02-17 | 20.7% | 15.9% | 2023-09 | 153,744 | 138,371 |
R00097NQNI | Slieve Kirk Windfarm | NI | 73,600 | On-shore wind | RO | 2011-10-26 | 2011-10-26 | 24.4% | 23.8% | 2023-10 | 153,303 | 140,380 |
R00006SASC | Caledonian CHP1 | Scotland | 26,043 | Dedicated biomass | RO | 2009-04-30 | 2009-04-30 | 75.9% | 66.8% | 2023-10 | 152,300 | 267,293 |
R00324RAEN | Ridham Dock biomass plant | England | 28,000 | Dedicated biomass | RO | 2015-07-01 | 2015-07-01 | 61.2% | 61.9% | 2023-10 | 151,870 | 204,064 |