IDRO ID or Rego ID uniquely identifying generator | Generator Name | CountryThe Renewables Obligation is administered in three areas, Northern Ireland, Scotland, and England/Wales. This field shows the country where the generator is located. | IC (kW)The total installed generating capacity of each generator in kilowatts (kW), as recorded by Ofgem. REF has corrected obvious errors. | TechnologyRenewable technology type | SubsidySubsidy mechanism RO,FiT,None | AccreditationThe date at which the generator was accorded accredited status with Ofgem; this is usually the date of first generation. | CommissionedDate when generator first commissioned | RLFThe rolling load factor is the average of all available rolling 12 month periods in the currently available data for the site. | ALFThe most recent annual load factor to year ending at Latest ROC Date | LatestDataLatest date for ROCs received | Latest MWh p.a.MWh generated in the latest year for which data is available | Latest ROCs p.a.ROCs earned in the latest year for which data is available |
HR2 | Hornsea 2 | England | 1,386,000 | Off-shore wind | CfD | 2022-01-19 | 2024-03-28 | 42.0% | 43.7% | 2024-12 | 5,244,660 | |
DRX | Drax CfD Unit 1 | England | 645,000 | Dedicated biomass | CfD | 2016-12-21 | 63.7% | 78.0% | 2024-12 | 4,418,930 | ||
HOR | Hornsea 1 | England | 1,200,000 | Off-shore wind | CfD | 2019-02-26 | 2021-03-31 | 44.8% | 41.1% | 2024-12 | 4,329,090 | |
TKN | Triton Knoll | England | 857,250 | Off-shore wind | CfD | 2021-03-05 | 2023-03-31 | 35.6% | 41.6% | 2024-12 | 3,100,300 | |
WAL | Walney Extension | England | 660,000 | Off-shore wind | CfD | 2017-09-02 | 2018-04-13 | 43.6% | 43.6% | 2024-12 | 2,528,310 | |
EAS | East Anglia 1 Offshore | England | 714,000 | Off-shore wind | CfD | 2019-09-02 | 2020-05-30 | 43.6% | 38.6% | 2024-12 | 2,419,170 | |
BEA | Beatrice Offshore | Scotland | 588,000 | Off-shore wind | CfD | 2018-07-18 | 2019-04-28 | 37.9% | 41.8% | 2024-12 | 2,156,280 | |
LYN | Lynemouth Power Station | England | 406,790 | Dedicated biomass | CfD | 2019-04-01 | 2018-06-23 | 52.2% | 52.6% | 2024-12 | 1,880,940 | |
MOE | Moray East | Scotland | 950,000 | Off-shore wind | CfD | 2021-06-22 | 2024-03-04 | 25.6% | 22.3% | 2024-12 | 1,861,050 | |
DUD | Dudgeon Offshore | England | 402,000 | Off-shore wind | CfD | 2017-09-19 | 2017-10-01 | 46.1% | 48.1% | 2024-12 | 1,668,230 | |
T_SGRWO | Seagreen Wind Energy Limited | Scotland | 1,140,000 | Off-shore wind | None | 2022-08-22 | 2022-08-22 | 15.2% | 13.9% | 2024-12 | 1,391,760 | |
TEE | Teesside Biomass | England | 299,000 | Dedicated biomass | CfD | 2022-08-09 | 2023-09-30 | 19.6% | 43.5% | 2024-12 | 1,097,440 | |
BUR | Burbo Bank Extension | England | 259,000 | Off-shore wind | CfD | 2016-11-12 | 2017-04-11 | 39.0% | 38.6% | 2024-12 | 874,058 | |
T_MOWWO | Moray West | Scotland | 884,000 | Off-shore wind | None | 2024-12 | 669,696 | |||||
T_SOKYW | South Kyle | Scotland | 240,000 | On-shore wind | None | 2023-08-14 | 2022-09-16 | 25.1% | 29.0% | 2024-12 | 604,361 | |
T_VKNGW | Viking | Scotland | 442,900 | On-shore wind | None | 2024-01-16 | 2024-12 | 356,291 | ||||
DOR | Dorenell Wind Farm | Scotland | 313,840 | On-shore wind | CfD | 2019-07-16 | 2018-12-20 | 23.8% | 18.8% | 2024-12 | 286,326 | |
CLO | Clocaenog Forest Wind Farm | Wales | 95,680 | On-shore wind | CfD | 2020-11-05 | 2019-10-31 | 27.4% | 26.2% | 2024-12 | 220,042 | |
T_AKGLW | Aikengall IIA | Scotland | 82,000 | On-shore wind | None | 2021-12-17 | 2021-08-07 | 24.4% | 26.9% | 2024-12 | 193,110 | |
BKM | Kype Muir Wind Farm | Scotland | 88,400 | On-shore wind | CfD | 2018-10-12 | 2019-03-28 | 25.7% | 24.4% | 2024-12 | 187,123 | |
T_KYPEW | Kype Muir Extension | Scotland | 67,200 | On-shore wind | None | 2023-02-01 | 2022-12-08 | 27.5% | 29.0% | 2024-12 | 170,934 | |
K3C | Kemsley K3 CHP | England | 45,000 | Waste | CfD | 2021-03-16 | 2020-07-17 | 33.4% | 40.6% | 2024-12 | 160,407 | |
T_CREAW | Creag Riabhach Wind Farm Ltd | Scotland | 93,000 | On-shore wind | None | 2023-01-11 | 2022-11-16 | 15.6% | 18.9% | 2024-12 | 153,900 | |
T_SAKNW | Sandy Knowe Wind Farm Ltd | Scotland | 86,400 | On-shore wind | None | 2022-11-28 | 2022-10-15 | 17.3% | 19.0% | 2024-12 | 144,285 | |
T_NNGAO | Neart Na Gaiothe | Scotland | 448,000 | Off-shore wind | None | 2024-12 | 137,772 | |||||
E_BTUIW | Beinn an Tuirc 3 | Scotland | 50,000 | On-shore wind | None | 2021-04-17 | 2021-05-20 | 27.5% | 28.9% | 2024-12 | 126,612 | |
T_KENNW | Kennoxhead | Scotland | 62,400 | On-shore wind | None | 2022-07-01 | 2022-06-07 | 21.5% | 22.3% | 2024-12 | 121,424 | |
T_CUMHW | Cumberhead Wind | Scotland | 57,600 | On-shore wind | None | 2023-03-21 | 2023-02-01 | 23.0% | 24.1% | 2024-12 | 117,046 | |
T_WDRGW | Windy Rig Wind Farm | Scotland | 43,200 | On-shore wind | None | 2022-07-28 | 2021-07-13 | 30.1% | 29.1% | 2024-12 | 110,129 | |
MYN | Mynydd Y Gwair Wind Farm | Wales | 32,210 | On-shore wind | CfD | 2019-07-05 | 2019-03-20 | 36.2% | 37.9% | 2024-12 | 107,217 | |
BRE | Brenig Wind Farm | Wales | 37,600 | On-shore wind | CfD | 2019-10-18 | 2019-03-29 | 32.3% | 32.3% | 2024-12 | 106,808 | |
T_CRDEW | Crossdykes Wind Farm | Scotland | 48,350 | On-shore wind | None | 2020-10-16 | 2020-12-11 | 24.6% | 24.9% | 2024-12 | 104,886 | |
T_TWSHW | Twentyshilling | Scotland | 37,800 | On-shore wind | None | 2022-07-29 | 2021-09-23 | 30.4% | 29.4% | 2024-12 | 97,542 | |
NAN | Nanclach Wind Farm | Scotland | 39,100 | On-shore wind | CfD | 2021-09-06 | 2019-10-01 | 34.5% | 28.1% | 2024-12 | 96,639 | |
BMM | Middle Muir Wind Farm | Scotland | 51,000 | On-shore wind | CfD | 2018-09-05 | 2019-01-09 | 22.4% | 21.4% | 2024-12 | 95,558 | |
E_BLARW | Blary Hill | Scotland | 35,000 | On-shore wind | None | 2021-11-15 | 2021-10-27 | 29.0% | 28.4% | 2024-12 | 87,379 | |
T_DBAWO | Dogger Bank A | England | 1,200,000 | Off-shore wind | None | 2023-10-07 | 0.7% | 0.8% | 2024-12 | 83,877 | ||
SOL | Solway Wind Farm | Scotland | 30,000 | On-shore wind | CfD | 2021-09-21 | 2020-11-27 | 26.4% | 31.9% | 2024-12 | 83,817 | |
SNE | Sneddon Law | Scotland | 30,000 | On-shore wind | CfD | 2023-10-09 | 2024-04-04 | 29.6% | 29.8% | 2024-12 | 78,609 | |
T_DOUGW | Douglas West Wind Farm | Scotland | 46,800 | On-shore wind | None | 2022-05-25 | 2021-07-07 | 22.4% | 19.1% | 2024-12 | 77,692 | |
BAD | Bad a Cheo Wind Farm | Scotland | 27,000 | On-shore wind | CfD | 2019-07-05 | 2019-03-31 | 26.5% | 33.5% | 2024-12 | 77,599 | |
E_GRGRW | Greengairs East Wind Farm | Scotland | 36,000 | On-shore wind | None | 2023-05-16 | 2023-04-25 | 23.9% | 24.3% | 2024-12 | 76,674 | |
T_GLNKW | Glen Kyllachy Wind Farm | Scotland | 50,000 | On-shore wind | None | 2021-06-22 | 2021-06-21 | 24.2% | 17.2% | 2024-12 | 75,377 | |
COI | Coire Na Cloiche Windfarm | Scotland | 30,520 | On-shore wind | CfD | 2020-02-02 | 2019-06-25 | 25.5% | 26.8% | 2024-12 | 70,613 | |
T_BURWS | Burwell Solar | England | 49,800 | Photovoltaic | None | 2023-12-01 | 14.6% | 14.6% | 2024-12 | 63,729 | ||
T_DALQW | Dalquhandy Wind Farm | Scotland | 42,000 | On-shore wind | None | 2022-12-29 | 2022-09-29 | 20.8% | 15.7% | 2024-12 | 58,061 | |
T_LARKS | Larks Green Solar | England | 49,900 | Photovoltaic | None | 2023-04-27 | 13.1% | 12.9% | 2024-12 | 56,635 | ||
T_SUTBS | Sutton Bridge Solar | England | 73,058 | Photovoltaic | None | 2024-02-16 | 2023-12-18 | 8.9% | 8.9% | 2024-12 | 54,274 | |
TLG | Tralorg Wind Farm | Scotland | 19,000 | On-shore wind | CfD | 2020-10-14 | 2020-11-13 | 30.7% | 32.0% | 2024-12 | 52,483 | |
T_HALSW | Halsary Windfarm | Scotland | 30,000 | On-shore wind | None | 2020-12-10 | 2020-12-10 | 25.8% | 17.6% | 2024-12 | 46,254 | |
T_GORDW | Gordonbush Extension | Scotland | 48,000 | On-shore wind | None | 2021-04-02 | 13.8% | 10.1% | 2024-12 | 42,708 | ||
E_PIBUW | Pines Burn | Scotland | 33,000 | On-shore wind | None | 2024-12 | 36,436 | |||||
BMH | Moor House Wind Farm | England | 12,000 | On-shore wind | CfD | 2017-12-22 | 2018-04-03 | 32.5% | 32.1% | 2024-12 | 33,703 | |
ACH | Achlachan Wind Farm | Scotland | 10,000 | On-shore wind | CfD | 2020-01-15 | 2019-04-08 | 31.9% | 35.4% | 2024-12 | 31,063 | |
T_BROCW | Broken Cross | Scotland | 48,000 | On-shore wind | None | 2024-05-17 | 6.9% | 6.9% | 2024-12 | 27,127 | ||
G01910HYSC | River Pattack Hydro Scheme | Scotland | 2,000 | Hydro | None | 2017-08-17 | 2017-08-17 | 67.7% | 78.2% | 2024-12 | 13,736 | |
LIG | Charity Farm Solar | England | 14,402 | Photovoltaic | CfD | 2016-06-23 | 2016-06-30 | 12.8% | 12.1% | 2024-12 | 12,698 | |
CAM | Triangle Farm Solar Park | England | 10,900 | Photovoltaic | CfD | 2023-01-13 | 2017-07-18 | 13.5% | 12.4% | 2024-12 | 11,846 | |
COM | Common Barn Wind Farm | England | 6,150 | On-shore wind | CfD | 2019-03-19 | 2019-06-18 | 30.8% | 22.2% | 2024-12 | 11,824 | |
G02606NWSC | MP1 Commercial | Scotland | 4,800 | On-shore wind | None | 2018-09-23 | 2018-09-23 | 25.9% | 27.5% | 2024-12 | 11,600 | |
G02612NWSC | Pogbie Community | Scotland | 4,800 | On-shore wind | FiT | 2019-03-05 | 2019-03-05 | 24.9% | 26.6% | 2024-12 | 11,199 | |
G02080NWSC | Glenbervie | Scotland | 4,620 | On-shore wind | FiT | 2014-07-08 | 2014-07-08 | 21.2% | 27.1% | 2024-12 | 10,996 | |
G01931HYSC | Uisge Dubh Hydro Scheme | Scotland | 2,000 | Hydro | None | 2017-09-19 | 2017-09-19 | 52.3% | 49.2% | 2024-12 | 8,642 | |
G01980HYSC | Loch a Bhraoin Hydro Scheme | Scotland | 1,995 | Hydro | FiT | 2020-09-30 | 2020-09-30 | 44.5% | 44.5% | 2024-12 | 7,793 | |
G01807HYSC | River Lochy Hydro Scheme | Scotland | 2,000 | Hydro | None | 2016-07-15 | 2016-07-15 | 45.5% | 42.0% | 2024-12 | 7,386 | |
G01493BWEN | Riverside AD | England | 1,700 | Anaerobic Digestion | None | 2013-06-15 | 2013-06-15 | 15.9% | 48.7% | 2024-12 | 7,270 | |
G01841NWSC | Brockholes Wind Cluster | Scotland | 2,430 | On-shore wind | FiT | 2012-11-26 | 2012-11-26 | 30.4% | 32.6% | 2024-12 | 6,969 | |
G01704HYSC | Bruar | Scotland | 1,900 | Hydro | FiT | 2015-06-05 | 2015-06-05 | 34.6% | 40.9% | 2024-12 | 6,820 | |
G01619HYSC | Ederline Hydro Scheme | Scotland | 1,908 | Hydro | FiT | 2014-01-24 | 2014-01-17 | 40.4% | 35.9% | 2024-12 | 6,024 | |
G23780PVEN | Netley North Solar Farm | England | 5,136 | Photovoltaic | None | 2023-03-31 | 2022-11-18 | 12.5% | 11.5% | 2024-12 | 5,200 | |
G02262NWSC | Plascow Turbine | Scotland | 1,500 | On-shore wind | FiT | 2015-06-01 | 2015-06-01 | 37.4% | 35.9% | 2024-12 | 4,728 | |
G06959PVEN | Bake Farm Solar Park | England | 4,999 | Photovoltaic | FiT | 2015-12-11 | 2015-12-11 | 8.5% | 10.4% | 2024-12 | 4,555 | |
G01826HYSC | Ben Glas Hydro | Scotland | 1,300 | Hydro | FiT | 2016-09-07 | 2016-09-07 | 35.3% | 38.1% | 2024-12 | 4,350 | |
G01569PVSC | New Mains of Guynd PV Park | Scotland | 4,988 | Photovoltaic | FiT | 2015-12-21 | 2015-12-21 | 7.7% | 9.9% | 2024-12 | 4,321 | |
G01762HYSC | Eas A Ghaill Hydro Scheme | Scotland | 1,500 | Hydro | FiT | 2015-12-07 | 2015-12-07 | 27.9% | 30.9% | 2024-12 | 4,077 | |
G07088PVEN | Grantham Solar Farm Ltd | England | 4,879 | Photovoltaic | FiT | 2015-12-23 | 2015-12-23 | 8.1% | 9.4% | 2024-12 | 4,023 | |
G06700PVEN | Newlands Farm Solar Park | England | 4,999 | Photovoltaic | FiT | 2015-10-05 | 2015-10-05 | 9.0% | 9.1% | 2024-12 | 4,013 | |
G02029HYSC | Chaorainn Hydro Ltd | Scotland | 1,360 | Hydro | FiT | 2022-10-20 | 2022-10-20 | 27.9% | 33.3% | 2024-12 | 3,981 | |
G02631NWEN | Limes | England | 1,500 | On-shore wind | FiT | 2014-11-28 | 2014-11-28 | 24.7% | 27.9% | 2024-12 | 3,679 | |
G01838HYSC | Taodail | Scotland | 1,350 | Hydro | FiT | 2016-09-19 | 2016-09-19 | 31.4% | 30.7% | 2024-12 | 3,640 | |
G02195NWSC | Little Hilton Farm | Scotland | 1,310 | On-shore wind | None | 2014-12-17 | 2014-12-17 | 31.4% | 31.5% | 2024-12 | 3,623 | |
G06649PVEN | Barton Close Solar Park | England | 4,610 | Photovoltaic | FiT | 2015-08-28 | 2015-08-28 | 7.8% | 8.5% | 2024-12 | 3,445 | |
G01928HYSC | Loch an Laoigh Hydro Scheme | Scotland | 950 | Hydro | None | 2017-09-14 | 2017-09-14 | 43.7% | 40.8% | 2024-12 | 3,407 | |
G07067PVEN | Wisbech Solar Farm Ltd | England | 3,405 | Photovoltaic | FiT | 2015-12-22 | 2015-12-22 | 8.2% | 10.7% | 2024-12 | 3,186 | |
G07089PVEN | Overton Solar Farm Ltd | England | 3,752 | Photovoltaic | FiT | 2015-12-23 | 2015-12-23 | 7.9% | 9.7% | 2024-12 | 3,181 | |
G02102NWSC | Whitestones | Scotland | 810 | On-shore wind | FiT | 2014-08-25 | 2014-08-25 | 40.6% | 40.8% | 2024-12 | 2,903 | |
G01695HYSC | Kames | Scotland | 900 | Hydro | FiT | 2015-04-14 | 2015-04-14 | 34.1% | 33.9% | 2024-12 | 2,677 | |
G01484HYSC | wester fearn | Scotland | 980 | Hydro | FiT | 2010-10-30 | 2010-10-30 | 30.6% | 30.3% | 2024-12 | 2,608 | |
G02101NWSC | Dounepark | Scotland | 810 | On-shore wind | FiT | 2014-08-25 | 2014-08-25 | 34.5% | 34.7% | 2024-12 | 2,471 | |
G01722NWSC | Scotston Wind Power | Scotland | 800 | On-shore wind | FiT | 2011-05-20 | 2011-05-20 | 33.6% | 32.2% | 2024-12 | 2,263 | |
G01654HYSC | Neaty Burn | Scotland | 700 | Hydro | FiT | 2014-10-07 | 2014-10-07 | 33.8% | 36.6% | 2024-12 | 2,251 | |
G02189NWSC | Cowie Hill | Scotland | 500 | On-shore wind | FiT | 2014-12-16 | 2014-12-16 | 48.0% | 48.7% | 2024-12 | 2,139 | |
G01870HYSC | Kendrum Burn Hydro Power Station | Scotland | 750 | Hydro | FiT | 2016-12-15 | 2016-12-15 | 31.1% | 32.2% | 2024-12 | 2,121 | |
G02369NWSC | Peattie | Scotland | 500 | On-shore wind | FiT | 2015-11-05 | 2015-11-05 | 43.5% | 45.8% | 2024-12 | 2,011 | |
G01575HYSC | Frenich Hydro | Scotland | 760 | Hydro | FiT | 2013-04-30 | 2013-04-26 | 28.0% | 29.3% | 2024-12 | 1,953 | |
G02501NWSC | Cairnhill 2 | Scotland | 500 | On-shore wind | FiT | 2016-09-14 | 2016-09-14 | 43.2% | 44.4% | 2024-12 | 1,950 | |
G02495NWSC | AGR High Dyke | Scotland | 500 | On-shore wind | FiT | 2016-09-09 | 2016-09-09 | 43.3% | 44.0% | 2024-12 | 1,934 | |
G01999HYSC | Deanston New Hydro 2019 | Scotland | 350 | Hydro | FiT | 2021-03-23 | 2021-03-23 | 50.0% | 61.9% | 2024-12 | 1,904 | |
G02315NWEN | KLT Wind Turbine | England | 1,500 | On-shore wind | FiT | 2013-11-15 | 2013-11-15 | 4.2% | 14.4% | 2024-12 | 1,896 | |
G01667NWWA | Blaenpant Wind Generation | Wales | 500 | On-shore wind | FiT | 2017-03-23 | 2017-03-23 | 40.9% | 42.3% | 2024-12 | 1,857 |