R00479RJEN G00591LGEN : Stone Landfill (Pits 5&6) - A,C

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2004/2005 (3) 822 62.5% * 1,109 1,109
2005/2006 822 63.5% 3,791 3,268
2006/2007 598 68.7% 3,597 3,597
2007/2008 598 54.8% 2,879 2,879
2008/2009 598 53.4% 2,798 2,798
2009/2010 330 65.4% 1,892 1,892
2010/2011 330 90.9% 2,629 2,629
2011/2012 330 78.0% 2,260 2,260
2012/2013 330 70.3% 2,033 2,033
2013/2014 330 59.4% 1,718 1,718
2014/2015 330 62.2% 1,798 1,798
2015/2016 330 57.4% 1,665 1,665
2016/2017 330 54.0% 1,560 1,560
2017/2018 (8) 330 47.3% * 914 834
Annual Totals to end Nov-17 1,3961,316
Rolling Load Factor64.6 %
Annual Load Factor to end Nov-1748.3 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.