R00090SQSC G01462NWSC : Redbog

Return to Table

GeneralMapSummaryLFMWh
RO Period Capacity (kW) Load Factor MWh ROCs
2008/2009 (9) 1,600 31.7% * 3,340 3,340
2009/2010 1,600 31.6% 4,429 4,429
2010/2011 1,600 31.4% 4,404 4,404
2011/2012 1,600 35.1% 4,930 4,930
2012/2013 1,600 29.9% 4,196 4,196
2013/2014 1,600 35.8% 5,016 5,016
2014/2015 1,600 31.6% 4,431 4,431
2015/2016 1,600 33.5% 4,706 4,706
2016/2017 (8) 1,600 26.6% * 2,489 1,413
Annual Totals to end Nov-16 4,5483,472
Rolling Load Factor32.6 %
Annual Load Factor to end Nov-1632.4 %

Notes:

1. RO period is the 12 months from 1 April to 31 March
2. Capacity is the total installed generating capacity in kW
3. Load Factor is calcuated for the 12 months of the RO period.
4. An asterisk (*) denotes fewer than 12 months of data is available in a given period; the actual number of months of data is in brackets in the first column.
5. The number of ROCs per MWh depends on whether the generator is subsidised under the RO and, from April 2009, the band into which the generator and technology falls.